[Construction Examples] Kumamoto Area Maintenance Work and Disaster Recovery Work / Void Filling Work
Disaster recovery and emergency response for roads! 100% filling of gaps and voids with polyurethane resin.
This is an introduction to a case of "preservation work and disaster recovery work" and "void filling work" conducted at the Higo Tunnel in Yamae Village, Kumamoto Prefecture. In early July 2020, record heavy rainfall in the Kumamoto Prefecture area caused large-scale river flooding and inundation damage, particularly along the Kumagawa River. We received a construction request from Nishi-Nippon Expressway Maintenance Kyushu Co., Ltd., and carried out emergency work to fill voids and cavities that had formed under the concrete pavement slabs due to water pressure caused by the rainfall disaster, within the section of the tunnel that was closed to traffic. 【Case Overview】 ■ Construction Location: Higo Tunnel, Yamae Village, Kumamoto Prefecture ■ Construction Area: 76m² for the passing lane, 76m² for the driving lane ■ Construction Period: 3 days *For more details, please refer to the PDF document or feel free to contact us.
- Company:アップコン 沈下修正の専門家【全国対応】【本社】神奈川県川崎市【事務所】札幌・仙台・名古屋・大阪・福岡
- Price:Other